Product Details:
|
Excavator: | Hitachi ZX360 | Boom Length: | 10000 Mm |
---|---|---|---|
Product Name: | Material Handling Arm | Certification: | ISO,CE |
Material: | Q345B+Q690D | Color: | Hitachi Orange |
High Light: | mini excavator extendable arm,material handling equipment,Hitachi ZX360 Material Handling Arm |
Hitachi ZX360 18m Material Handling Arm Broken Rocks Unloading Heavy Duty
Description:
Material Handler boom mainly for loading,unloading and transpoting work,very high efficient. It's popular in loading & Unloading of Coal,Sand,Corn,etc. Material Handler also popular in recycling company. Long reach excavator boom arm is larger work range,very popular and high efficient in dredging work,dredging river,dredging sea,dredging port,etc. Because long boom have larger workrange,so also popular in lots of constructions,such as subway construction,dam construction,etc
Specification Of Our Standard Material Handling Boom Arm:
Model | HK-MHB300 | HK-MHB400 | HK-MHB500 |
Excavator / ton | 25~33 | 34~45 | 46~55 |
Total Length / mm | 13000 | 16000 | 20000 |
Boom Length / mm | 7800 | 9100 | 12100 |
Stick Length / mm | 5200 | 6900 | 7900 |
Max work range / mm | 11800 | 14800 | 18500 |
Max Loading Height / mm | 5000 | 7600 | 8800 |
Attachments Weight / kg | 1200 | 2000 | 2500 |
Max Lift Capacity / ton | 1.8 | 3.5 | 4 |
Counter weight / ton | No need | 2 | 4 |
Above parameter is our standard parameters,if you need special design,we can customize for you.
Specification of our standard long reach excavator boom arm:
Model | Total Length (mm) |
Self weight (kg) |
Max reach (mm) |
Max cut depth (mm) | Max cut Height(mm) |
Folding height(mm) | Bucket Vol. (cum) |
Excavator (Ton) |
LR120 | 13000 | 2800 | 12500 | 9000 | 11300 | 2900 | 0.3 | 10~15 |
LR200-1 | 15500 | 4150 | 15400 | 11340 | 12510 | 2980 | 0.6 | 16~22 |
LR200-2 | 18000 | 4400 | 17600 | 12200 | 13500 | 3040 | 0.4 | 20~24 |
LR300 | 18000 | 5200 | 17600 | 12200 | 13720 | 3210 | 0.4 | 25~33 |
LR350 | 20000 | 6000 | 19600 | 14500 | 14920 | 3320 | 0.5 | 30~36 |
LR400 | 22000 | 6500 | 21600 | 16100 | 16100 | 3400 | 0.6 | 35~42 |
LR450 | 24000 | 7000 | 23200 | 18000 | 17300 | 3430 | 0.6 | 40~50 |
Above parameter is our standard parameters,if you need special design,we can customize for you.
Specification of this Hitachi ZX360 18m Material Handling Boom Arm:
Total length | 18000 mm |
Boom length | 10000 mm |
Stick length | 8000 mm |
Bucket | 1.2 cum shell bucket |
Max reach | 17000 mm |
Max Load &unload height | 11100 mm |
Max Load & unload depth | 13200 mm |
Material | Q345B+Q690D |
Extra counter weight | No need |
This HItachi ZX360 18m Material Handling boom arm is a special mixed design.
The Mainbody of long boom is our standard Long reach boom arm design,but bucket is a clamshell bucket.
Because customer need this long boom to do both loading&unloading work,also can do excavating work.
Dismantling the clamshell bucket and replacing a GP bucket,the excavator is a long boom excavator for excavating.
Our service:
1. We specialized in customizing all kinds of long boom for all kinds of excavators.
We have detailed dimension of this Hitachi ZX360 excavator,so just give us the excavator model is ok.
2. Main sheet Material of this Hitachi ZX360 excavator long reach material Handling boom arm is Q345B + Q690D,the top and bottom cover plate of boom and stick is Q690D,and other sheet is Q345B,Pin’s material is 42CrMo4.
3. Before welding,we have use big edge milling machine mill the edge of the sheet.So the welding can go to the internal of the steel-sheet and make the structure have higher performance.
4. Welding is protective gas welding,the protective gas is 80% Argon and 20% CO2 mixed.
5.For all long boom we produced,will supply follow parts:
Bucket:1 pcs
Linkage:1 kits
Bucket cylinder:1 pcs
Hydraulic pipe:1 kits
Lubricant pipe:1 kits
Counter weight(if need):1 pcs
Stick cylinder:Can match original stick cylinder to save cost,if you need,we also can prepare.
For bigger excavator(tonnage higher than 50ton),we advise use the original stick cylinder,original cylinder quality much more better.
Application:
1. The long boom is a double function long boom,The customer is a High Speed Road construction projects contractor.
2. Customer Purchase the long boom for broken rock unloading from Barge.
3. After broken rocks unloading,customer also need the long boom can replace a GP bucket for excavating work.
Contact Person: Terry Wang
Tel: +86-13662847893
Fax: 86-769-88882384-001